Shed Frame (Stage 1)
Shed Frame (Stage 2)
Shed Frame (Stage 3)
Spa Farm
05/08/06: Practical Workshop
Eartha Practical Workshop (Preperation)
Eartha Practical Workshop (Lecture)
Eartha Practical Workshop (Unrendered)
Eartha Practical Workshop (Render)
Eartha Practical Workshop (The Wall)
Eartha Practical Workshop (Limewash)
Eartha Practical Workshop
Eartha Practical Workshop (Wax Floor)
Eartha Practical Workshop (Bedroom)
Awaiting Rendering
Rendering Progress
Rendering Complete
Different View
New clay lump blocks ready for construction.
Under the supervision of Richard and Dirk, building begins.
The mortar used is a crushed clay/sand mix and will dry to the same colour as the blocks.
Repaired render should be left to fully dry before protecting with tar or limewash.
Intenal repairs use the same method
| Home | About us | FAQ's | Newsletters / Events | Photo Gallery | Technical Papers | Links | New Build | Contact Us |